Winter 2012 Mairie de Montpellier
Winter 2012
Winter 2012
December 2011, Frontignan Plage. Paintwork and extension of mezzanine floor.
Recent stuff
May Marina
The project was to extend the lounge area into the existing covered terrace.
The work involved moving forward the 3m wide sliding window system and the electric roller shutter. Leveling of the existing terrace floor to the same height as the lounge. Installing a false ceiling with spotlights. Installing the electrics including dimmer switches for the lighting. Moving the full height radiator. Wood panel line the walls, with a whitened finish and install wood flooring to the whole area.