December 2011

21 12 2011





Recent stuff

24 10 2011

Before

After

Old fire place modernized

Fire place..before





May Marina

27 05 2011

The project was to extend the lounge area into the existing covered terrace.

The work involved moving forward the 3m wide sliding window system and the electric roller shutter. Leveling of the existing terrace floor to the same height as the lounge.  Installing a false ceiling with spotlights. Installing the  electrics including dimmer switches for the lighting. Moving the full height radiator. Wood panel line the walls, with a whitened finish and install wood flooring to the whole area.





May 2011

9 05 2011

The chateau walls and ceiling needed serious repair work. 

Flowers at the Marina – Grau du roi





Avant et aprés, before and after.

13 04 2011

04.2011

2008 (by me)..they got fed up with the colour.





Realisation… April 2011

8 04 2011





Plans for the future

18 01 2011





01.2011

12 01 2011





Happy New Year

1 01 2011





12 2010 b

4 12 2010








Suivre

Get every new post delivered to your Inbox.