May Marina
27 05 2011The project was to extend the lounge area into the existing covered terrace.
The work involved moving forward the 3m wide sliding window system and the electric roller shutter. Leveling of the existing terrace floor to the same height as the lounge. Installing a false ceiling with spotlights. Installing the electrics including dimmer switches for the lighting. Moving the full height radiator. Wood panel line the walls, with a whitened finish and install wood flooring to the whole area.


Commentaires : Laisser un Commentaire »
Catégories : Uncategorized
Avant et aprés, before and after.
13 04 2011Commentaires : Laisser un Commentaire »
Catégories : Uncategorized
Realisation… April 2011
8 04 2011Commentaires : Laisser un Commentaire »
Catégories : Uncategorized



































